ABOUT MODUSTEEL
Steel framing built
by builders,
not just sold to them.
ModuSteel is the manufacturing arm of a vertically integrated builder-developer. We design, roll-form, panelize, and ship cold-formed steel framing systems — and we also build with them. This is not a startup. It's a builder that decided to make its own steel.

2020
Year M4GC founded
Charlotte, NC
NC + SC
Active GC licenses
L.103338 · G.122848
6–9
Days to dry-in (SFR)
2,200 SF typical
<2%
Shop-floor waste
vs. 12–18% stick frame
THE STRUCTURE
The M4 Group
ModuSteel sits inside a vertically integrated operating group that holds active GC licenses, active development projects, and active site-work operations across the Carolinas, Florida, and Alabama. Every panel we ship gets tested by our own crews first.
M4 General Contractors self-performs sitework, public water, and utilities in addition to vertical construction. Foundation-to-frame coordination — the sequencing that makes panel delivery work — happens under one roof, not across three subcontract relationships.
This is not a venture-funded startup. M4 Development Holdings was founded by builders to solve the problems builders face — starting with the framing schedule.
M4 Development Holdings
Parent holding company
Active development portfolio — NC, SC, FL, AL
M4 General Contractors
Licensed GC · NC L.103338 · SC G.122848
Ground-up residential + commercial
ModuSteel
CFS framing manufacturer
← You are here
Southern View Homes
SFR development brand
Consumes ModuSteel panels
M4 Aggregates
Materials supply
Aggregate supply chain
HOW WE OPERATE
Four principles that run the shop floor.
01
Vertical integration is the advantage
We don't sell steel to builders who figure it out themselves. We are the GC. We know what a framing crew needs on Monday morning — because we have one.
02
Shop-fabricated beats field-built
Panels assembled in a controlled shop environment are plumb, true, and sequenced. The jobsite is for erection, not fabrication.
03
Fixed price means fixed price
Material cost is locked at PO. Your budget recap won't have a line item for lumber surcharges mid-project. That's not a marketing claim — it's how the contract reads.
04
Builders don't need a pitch deck
We talk schedule, trade stack, and punch list. If you want to know what our panels do for your job cost, submit a plan set and we'll show you with numbers.