Multifamily Steel Framing (4-Plex to 6-Story Wrap)

Select an application to explore the framing approach and project requirements. Final spans, assemblies, engineering, production and delivery dates are confirmed for your plans and location.

SYSTEM SPEC — MULTIFAMILY

Multifamily Steel Framing (4-Plex to 6-Story Wrap)

From 4-plexes to 6-story wrap buildings. CFS compresses your schedule by 4–8 weeks per building, reduces your insurance loss-ratio class, and eliminates the per-unit framing variance that drives drywall callbacks.

  • 4–8 weeks saved per building vs. stick framing
  • Non-combustible construction lowers your insurance loss-ratio class
  • No per-unit framing variance — fewer drywall callbacks

Typical Clear Span

Up to 40 ft clear span

Fire Rating

Type III-A / Type I Non-Combustible

Panel Sizes

6″ – 8″ structural wall panels + floor cassettes

Lead Time

Engineering 5–7 days; full-building BOM on request

FREE TECHNICAL DOWNLOAD

Get the ModuSteel Panel Spec Book

Gauge schedules, panel dimensions, load tables, and the Slab-to-Roof System — 14 pages. No fluff.

FREE DOWNLOAD

Panel Spec Book

I agree to receive text messages from ModuSteel USA, LLC about my inquiry, quotes and appointments. Msg frequency varies. Msg & data rates may apply. Reply STOP to opt out, HELP for help. Consent is not a condition of purchase. See SMS Terms and Privacy Policy.

No spam. One follow-up from a ModuSteel USA team member. Unsubscribe anytime.

SECONDARY DOWNLOAD

Already convinced on quality?

Run the cost numbers — CFS vs. Stick-Frame GC P&L.

Ask ModAI for Help